top of page

Honoring Our Past & Strengthening Our Future.

CONNECTED IN FAITH

A Project to Renovate and Expand Bishop Hogan Memorial School

This project is about building a campus that matches the strength of our mission. A campus that:

- Keeps students safe and secure

- Supports modern learning and faith formation

- Provides space for parish life, fellowship, and community

- Honors the past while allowing for classroom expansion in the future

SCAN QR CODE TO DONATE

Phase 1 - Rendering 1.png

New Connecting Corridor

Phase 1

Phase 1 - Rendering 2.png

Façade Improvements

Phase 1

Phase 2 - Rendering 1.png

New Parish Hall

Phase 2

Phase 2 - Rendering 2.png

New Offices/Parking Lot

Phase 2

Phase 1
What We Need

Phase 1 is all about what needs to happen now.

The main school building's cornerstone was laid on September 8, 1957. Rapidly approaching its 70th birthday, the building itself along with its mechanical, electrical, and plumbing are all in desperate need of upgrades. Additionally, we must address the separation of our school buildings. 

Connecting the Buildings

The main building and the St. Leo building are both being fully utilized but they are not connected. This means that regardless of the weather or circumstances, students have to cross outside between the buildings on a daily basis.

 

The centerpiece of Phase 1 is the construction of a new, secured corridor that will allow free passage throughout the entirety of the school's campus.

Connection.jpg
Phase 1 - Floor Plan.png

Renovation Needs

window walls.jpg

The window walls along the façade are single-pane, cracking, and mainly covered inside for more usable wall space. New windows and insulated panels will replace these.

Radiators.jpg

Outdated radiators and aging mini-splits are providing inconsistent and unreliable heating and cooling. These will be replaced with central heating/air throughout the entire building.

Electrical.jpg

Each classroom was only equipped with two outlets, one on either end of the room. This is untenable in our technological age. The entire building's electrical system will be upgraded.

Plumbing.jpg

The plumbing and fixtures are all very much outdated and will also be updated and replaced

Phase 1 Cost Estimates

Cost estimates for Phase 1 are construction estimates only. With architectural and contractor fees, the final costs of Phase 1 will be slightly higher. 

Corridor

$420,000

Renovations

The renovation has a budget of $2,000,000

The architect/contractor are making their recommendations as to what can be done in Phase 1 based on that budget. 

Connected in Faith

A Prayer for the Campaign and Project

Heavenly Father, we thank you for the gift of our parish and school and for all the lives they have shaped in faith, wisdom, and service. You have blessed us for generations in Chillicothe, and we trust in Your continued guidance. 

 

Pour out Your grace upon this project and campaign. Inspire generosity in the hearts of alumni, families, parishioners, and friends. Unite us in purpose, strengthen us in commitment, and help us to see this work as a mission for Your glory and for the future of our children. 

 

May every gift given and every prayer offered build a lasting foundation of faith, excellence, and love. We ask this through Christ, our Lord, Amen. 

 

Bishop Hogan, pray for us!

St. Columban Catholic Church

1111 Trenton Street, Chillicothe, MO 64601

660-646-0190

bottom of page